Our Projects
USF Research Park
University of South Florida, Temple Terrace, Florida
USF Research Park
University of South Florida, Temple Terrace, Florida
Steel Erection
Equipment Used
Manitowoc 888 (250 Ton Crawler Crane w/ Luffer)
Project Duration
3 Months
Rollins College
Rollins College – Winter Park, FL
Rollins College
Rollins College – Winter Park, FL
Steel Erection
Equipment Used
Grove RT600E (40 Ton Rough Terrain Crane)
Project Duration
2 Months
Tampa International Airport
TIA Tampa, Florida
Tampa International Airport
TIA Tampa, Florida
Garage Demotion, Precast Panel Hoisting, Removal
Equipment Used
Link-belt HTC8675 Series 2
Project Duration
3 Months
Orlando Magic Training Facility
Orlando, FL
Orlando Magic Training Facility
Orlando, FL
Concrete Erection, Miscellaneous Hoisting
Equipment Used
Terex RT670 (70 Ton Rough Terrain Crane) + Link-belt HTC8675 Series 2
Project Duration
6 Months
Madison Landing
Altamonte Springs, FL
Madison Landing
Altamonte Springs, FL
Precast Elevator Shafts
Equipment Used
Link-belt HTC8675 Series 2
Project Duration
3 Days
JW Marriott Water Street
Downtown Tampa, Florida
JW Marriott Water Street
Downtown Tampa, Florida
Steel Erection
Equipment Used
Manitowoc 14000 (220 Ton Crawler Crane w/ Fixed Jib)
Project Duration
7 Months
Amazon Distribution Facility
Deltona, Florida
Amazon Distribution Facility
Deltona, Florida
Steel Erection
Equipment Used
Terex RT670 (70 Ton Rough Terrain Crane)
Project Duration
4 Months
Serving Orlando Since 1995
Annual Inspections
Expedited Dispatch
Optimized Safety
24/7 Support
Family-Owned
Industry Experts
Minority-Owned
Customer-Focused
Get a Free Quote
"*" indicates required fields